Lineside Fence Renewals & Upgrades
TRAC were appointed as Main Contractor, to undertake line side fence renewals and upgrades for Network Rail West Scotland.The first phase involved the negotiations for...
Preston Ballast Regulating
National Cycle Network
The works formed phase 1...
TETRA Installation - Rosilly Bar
TRAC Engineering Ltd were appointed as the build contractor to undertake the TETRA site build at Rosilly Bar. The system being installed was part of the TETRA Emergency Services...
Corrieshalloch Gorge Inspection
Corrieshalloch Gorge is situated on the Droma River, in the Scottish Highlands. The 46m high Falls of Measach can be viewed from a viewing platform and a Victorian...
Bell Rock Lighthouse Maintenance
Rock Stabilisation - Dover Castle
M80 Redburn Culvert
TRAC was appointed by HMC to construct a RECO retaining wall system at either side of the Redburn culvert extension below the Castlecary arches along the M80. Access to both...
Wi4 WiMAX Network Roll Out
The wi4 WiMAX system included the...
Beauly Viaduct Refurbishment
TRAC recently completed the refurbishment of Beauly Viaduct as Principal Contractor under NR9 Design and Construct Conditions of Contract. The works comprised structural steel...
National Space Centre Inspection
Following a successful...
Cove Slope Stabilisation
TRAC installed slope drainage and erosion control facing systems at Cove, Berwickshire. The scheme was developed to slow sea cliff erosion threatening to undermine the...
Scottish Parliament Facilities Management
TRAC will have permanent site based teams providing high level (internal &...
M80 Structures Refurbishment
TRAC was appointed as Principal Contractor by Transport Scotland to complete the refurbishment of existing structures at 9 sites along the M80. The works required traffic...
Glasgow Central Station - Gantry Refurbishment