Trac Engineering Ltd

Rail Plant Autumn Works

In preparation for the autumn period, Network Rail has hired TRAC’s Bremach, Unimog 1250 and Landrover to carry out works in the Croydon, Barnsley and Leeds areas.

The specialist RRVs will treat the rail head with cleanser to prevent contamination by the fallen leaves during the autumn season. In addition, TRAC operators will use the Billy Goat attachment, shown below, on the Bremach to break down fallen vegetation in the area.

The machines will be working six nights per week from the beginning of October through until Christmas.

Website by WDG