Trac Engineering Ltd

Fixing the Lamington Viaduct

TRAC Rail assisted with the fix and rebuild of the Lamington Viaduct after Storm Frank. The team worked day and night over the festive period, to ensure that the works were completed as soon as physcially possible, in order to allow the Lamington Viaduct to reopen and the train lines to return to its normal time table.
Website by WDG